micro--go-micro
a646ac0241
Run Tests / Unit Tests (push) Has been cancelled
Harness (E2E) / Harnesses (mock LLM) (push) Has been cancelled
Lint / golangci-lint (push) Has been cancelled
Harness (E2E) / Provider harnesses (live LLM conformance) (push) Has been cancelled
Run Tests / Etcd Integration Tests (push) Has been cancelled
29 行
2.1 KiB
Markdown
29 行
2.1 KiB
Markdown
# Priorities
|
|
|
|
The ranked work queue for the autonomous improvement loop. The
|
|
**architecture-review** pass (the *architect*) owns this file: each run it turns
|
|
the [roadmap](../../ROADMAP.md) plus an internal scan (gaps in the
|
|
services → agents → workflows lifecycle, API coherence, drift, tech debt, test and
|
|
DX friction) into a single ordered list — highest-value first — and links each
|
|
item to a tracking issue. The hourly **continuous-improvement** pass works the
|
|
**top item whose issue is still open**. So the architect decides *what*, and the
|
|
increment loop *builds* it.
|
|
|
|
**Reading / editing.** An item is done when its linked issue closes (the increment
|
|
that builds it adds `Closes #<issue>`). Roadmap phase (Now → Next → Later) is the
|
|
primary ordering; internal findings are interleaved by value, not kept in a
|
|
separate list. The human can reorder this list — or the issues — at any time to
|
|
redirect the loop; direction always wins.
|
|
|
|
**Off-limits to the loop** (the architect proposes these as notes, never as queue
|
|
items the loop can auto-merge): brand/positioning copy, breaking public-API
|
|
changes, architectural rewrites. Those go to the human.
|
|
|
|
## Work queue (ranked)
|
|
|
|
1. **Broaden provider streaming conformance** ([#4386](https://github.com/micro/go-micro/issues/4386)) — The blog and roadmap now agree that Anthropic streaming shipped, but the roadmap still calls for provider-backed streaming across chat and A2A. Add a focused, provider-gated conformance slice so streaming stays end-to-end rather than becoming a one-provider success story.
|
|
2. **CI-verify the getting-started 0→1 and 0→hero contract** ([#4428](https://github.com/micro/go-micro/issues/4428)) — Developer adoption is the current goal, and the README/website promise scaffold → run → call plus a no-secret services → agents → workflows path. Keep that on-ramp as a CI-verifiable contract with clear failure boundaries so first-agent success stays weighted alongside harness depth.
|
|
|
|
_Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the
|
|
architecture-review pass._
|