项目文件夹

文件
Codex bca3ec2e1d
Harness (E2E) / Harnesses (mock LLM) (push) Has been cancelled
Harness (E2E) / Provider harnesses (live LLM conformance) (push) Has been cancelled
Lint / golangci-lint (push) Has been cancelled
Run Tests / Unit Tests (push) Has been cancelled
Run Tests / Etcd Integration Tests (push) Has been cancelled
docs: refresh planner priorities for 4308
2026-07-08 03:06:10 +00:00

30 行
2.7 KiB
Markdown

# Priorities
The ranked work queue for the autonomous improvement loop. The
**architecture-review** pass (the *architect*) owns this file: each run it turns
the [roadmap](../../ROADMAP.md) plus an internal scan (gaps in the
services → agents → workflows lifecycle, API coherence, drift, tech debt, test and
DX friction) into a single ordered list — highest-value first — and links each
item to a tracking issue. The hourly **continuous-improvement** pass works the
**top item whose issue is still open**. So the architect decides *what*, and the
increment loop *builds* it.
**Reading / editing.** An item is done when its linked issue closes (the increment
that builds it adds `Closes #<issue>`). Roadmap phase (Now → Next → Later) is the
primary ordering; internal findings are interleaved by value, not kept in a
separate list. The human can reorder this list — or the issues — at any time to
redirect the loop; direction always wins.
**Off-limits to the loop** (the architect proposes these as notes, never as queue
items the loop can auto-merge): brand/positioning copy, breaking public-API
changes, architectural rewrites. Those go to the human.
## Work queue (ranked)
1. **Fix AtlasCloud A2A streaming fallback tool-call reporting** ([#4297](https://github.com/micro/go-micro/issues/4297)) — The guarded-delegation failure closed with #4307, so the top remaining Now-phase provider defect is the A2A streaming fallback path reporting neither tool-call evidence nor run metadata (`tool=false runInfo=false`). A2A streaming is a critical interop seam for agents-as-services, and the fix should stay narrowly focused on surfacing tool/run evidence in the existing harness.
2. **Propagate cancellation and retry signals through provider model calls** ([#4273](https://github.com/micro/go-micro/issues/4273)) — Once the current live AtlasCloud reporting failure is stable, the remaining Now-phase resilience seam is provider-boundary cancellation/deadline/retry behavior across the agent loop. Keep it focused on fakes/tests and avoid public API or architecture changes.
3. **CI-verify zero-to-hero deploy dry-run path** ([#4309](https://github.com/micro/go-micro/issues/4309)) — Developer adoption remains the current goal, and the docs now have a strong no-secret first-agent path; the next adoption gap is making sure the documented scaffold → run → chat → inspect → deploy dry-run lifecycle is continuously verified through the deploy boundary, not just described. This keeps the 0→hero contract honest without displacing the two active Now-phase provider/resilience fixes.
_Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the
architecture-review pass._