micro--go-micro
31f2c2119a
Run Tests / Unit Tests (push) Has been cancelled
Harness (E2E) / Harnesses (mock LLM) (push) Has been cancelled
Harness (E2E) / Provider harnesses (live LLM conformance) (push) Has been cancelled
Lint / golangci-lint (push) Has been cancelled
Run Tests / Etcd Integration Tests (push) Has been cancelled
30 行
2.7 KiB
Markdown
30 行
2.7 KiB
Markdown
# Priorities
|
|
|
|
The ranked work queue for the autonomous improvement loop. The
|
|
**architecture-review** pass (the *architect*) owns this file: each run it turns
|
|
the [roadmap](../../ROADMAP.md) plus an internal scan (gaps in the
|
|
services → agents → workflows lifecycle, API coherence, drift, tech debt, test and
|
|
DX friction) into a single ordered list — highest-value first — and links each
|
|
item to a tracking issue. The hourly **continuous-improvement** pass works the
|
|
**top item whose issue is still open**. So the architect decides *what*, and the
|
|
increment loop *builds* it.
|
|
|
|
**Reading / editing.** An item is done when its linked issue closes (the increment
|
|
that builds it adds `Closes #<issue>`). Roadmap phase (Now → Next → Later) is the
|
|
primary ordering; internal findings are interleaved by value, not kept in a
|
|
separate list. The human can reorder this list — or the issues — at any time to
|
|
redirect the loop; direction always wins.
|
|
|
|
**Off-limits to the loop** (the architect proposes these as notes, never as queue
|
|
items the loop can auto-merge): brand/positioning copy, breaking public-API
|
|
changes, architectural rewrites. Those go to the human.
|
|
|
|
## Work queue (ranked)
|
|
|
|
1. **CI-verify the first-agent 0-to-hero contract** ([#4272](https://github.com/micro/go-micro/issues/4272)) — Current goal is developer adoption, and the README/website now describe a strong first-agent path after the examples wayfinding work (#4239/#4266), but the highest-value next increment is making that on-ramp executable as a provider-free contract. Prove scaffold → run → chat → inspect → deploy dry-run against the maintained examples so services → agents → workflows is something a new developer can walk, not just read.
|
|
2. **Propagate cancellation and retry signals through provider model calls** ([#4273](https://github.com/micro/go-micro/issues/4273)) — With the AtlasCloud guarded-delegation failures closed by #4270, the next Now-phase reliability seam is real-provider failure handling: context deadlines, cancellation, retry/backoff, and rate limits must not duplicate completed tool side effects. Keep this behind focused tests/fakes and avoid public API changes.
|
|
3. **Add an agent debugging quickcheck to the CLI harness** ([#4274](https://github.com/micro/go-micro/issues/4274)) — The on-ramp is only credible if the first surprising agent run is inspectable. Add provider-free harness coverage for the documented `micro inspect agent`/run-inspection path and keep README/website debugging wayfinding aligned, so the inner loop does not stop at “it ran” but reaches “I can understand what happened.”
|
|
|
|
_Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the
|
|
architecture-review pass._
|