项目文件夹

文件
Codex 714f90cf98
Harness (E2E) / Harnesses (mock LLM) (push) Has been cancelled
Harness (E2E) / Provider harnesses (live LLM conformance) (push) Has been cancelled
Lint / golangci-lint (push) Has been cancelled
Run Tests / Unit Tests (push) Has been cancelled
Run Tests / Etcd Integration Tests (push) Has been cancelled
Update architect priority queue
2026-06-27 16:46:35 +00:00

42 行
2.3 KiB
Markdown

# Priorities
The ranked work queue for the autonomous improvement loop. The
**architecture-review** pass (the *architect*) owns this file: each run it turns
the [roadmap](../../ROADMAP.md) plus an internal scan (gaps in the
services → agents → workflows lifecycle, API coherence, drift, tech debt, test and
DX friction) into a single ordered list — highest-value first — and links each
item to a tracking issue. The hourly **continuous-improvement** pass works the
**top item whose issue is still open**. So the architect decides *what*, and the
increment loop *builds* it.
**Reading / editing.** An item is done when its linked issue closes (the increment
that builds it adds `Closes #<issue>`). Roadmap phase (Now → Next → Later) is the
primary ordering; internal findings are interleaved by value, not kept in a
separate list. The human can reorder this list — or the issues — at any time to
redirect the loop; direction always wins.
**Off-limits to the loop** (the architect proposes these as notes, never as queue
items the loop can auto-merge): brand/positioning copy, breaking public-API
changes, architectural rewrites. Those go to the human.
## Now (ranked)
1. **Durable agent loop** (#3010) — checkpoint and resume an agent run via
`flow.Checkpoint` so long-running agents survive restarts without replaying
completed tool calls. Roadmap → *Next*; promoted because the Now hardening
items (0→hero and provider matrix) have shipped, and durability is the biggest
remaining harness-operability gap.
2. **Streaming end to end** (#3012) — `ai.Stream` through `micro chat`, the agent
RPC, and A2A `message/stream`; scope to chat + one provider first. Roadmap →
*Next*.
3. **Registry disconnection detection** (#2956) — readiness/health when a service
silently loses its registry connection. Community-requested production
reliability; keeps the service substrate operable because agents depend on
discovery.
4. **Execution lifecycle hooks & metadata** (#2980) — before/after-tool, retry,
and failure hooks; first check overlap with the shipped run-timeline /
OpenTelemetry work and scope to what's not already covered.
_Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the
architecture-review pass._