# Plan Sections
|
|
|
|
This reference describes what makes a great implementation plan. It does NOT
|
|
prescribe how the plan looks on the page — rendering is handled by the
|
|
format-specific references (`markdown-rendering.md`, `html-rendering.md`).
|
|
|
|
## The outcome
|
|
|
|
A great plan enables three audiences to act:
|
|
|
|
- **The implementing agent** (`ce-work` or a human) starts from an informed
|
|
baseline — load-bearing decisions are named, research breadcrumbs orient
|
|
their own investigation, unit boundaries are clear. The plan gives the
|
|
implementer a starting point, not a substitute for their own investigation.
|
|
- **The reviewer** identifies the load-bearing decisions and the boundaries
|
|
of what's being changed in one pass.
|
|
- **The future reader** (anyone returning months later) traces why the work
|
|
was done, what shaped it, and where the artifacts live.
|
|
|
|
Sections earn their place by serving one of these audiences. Omit padding.
|
|
|
|
## Unified plan artifact contract
|
|
|
|
`ce-plan` writes the canonical compound-engineering plan artifact. The same
|
|
artifact may begin as a requirements-only skeleton from `ce-brainstorm` and
|
|
later be enriched by `ce-plan`; it is still one plan file moving through
|
|
readiness states, not a requirements doc plus a separate implementation doc.
|
|
|
|
When the artifact is meant to be consumed by implementation agents, use:
|
|
|
|
- **`artifact_contract: ce-unified-plan/v1`** — declares this contract.
|
|
- **`artifact_readiness`** — document completeness, not work progress. Valid
|
|
values are:
|
|
- `requirements-only` — Product Contract exists; planning sections are not
|
|
complete and the artifact is not executable.
|
|
- `implementation-ready` — Product Contract, Planning Contract,
|
|
Implementation Units, Verification Contract, and Definition of Done are
|
|
complete enough for `ce-work`, `/goal`, or an equivalent executor, **and no
|
|
launch-blocking open question remains**. A plan that is otherwise complete
|
|
but still has a blocking product/architecture question stays
|
|
`requirements-only`, so the next step it routes to is blocker resolution /
|
|
planning, not implementation. Deferred (non-blocking) questions
|
|
do not hold readiness back — mark each open question as blocking or deferred
|
|
so this distinction is explicit.
|
|
- **`product_contract_source`** — where the Product Contract came from:
|
|
`ce-brainstorm`, `ce-plan-bootstrap`, `legacy-requirements`, or another
|
|
explicit source string when a repo has a specialized producer.
|
|
- **`execution`** — `code` for implementation plans, `knowledge-work` for
|
|
non-code deliverables. Absence remains legacy-compatible and means `code`
|
|
only for older plans without `artifact_contract`.
|
|
|
|
Do **not** use progress-like readiness values such as `active`,
|
|
`in_progress`, `completed`, or `done`. Readiness answers "can the artifact be
|
|
executed?", not "has execution happened?" Plans still carry no `status` field
|
|
and no mutable execution lifecycle.
|
|
|
|
Do **not** use `artifact_readiness: approach-plan`. Approach-plans,
|
|
answer-seeking outputs, and universal-planning outputs are outside this
|
|
software implementation artifact contract unless they include the full Product
|
|
Contract, Planning Contract, Implementation Units, Verification Contract, and
|
|
Definition of Done required for software execution. Route those artifacts by
|
|
their own shape or by `execution: knowledge-work`, not by adding a third
|
|
unified readiness value.
|
|
|
|
## Section ID Registry
|
|
|
|
Unified artifacts use these stable logical sections. Markdown uses the
|
|
heading text; HTML uses matching visible headings and anchor IDs. Downstream
|
|
skills grep or anchor-scan for these names before reading large bodies.
|
|
|
|
| Logical section | Markdown heading | HTML id | Reader use |
|
|
|---|---|---|---|
|
|
| Goal Capsule | `## Goal Capsule` | `goal-capsule` | Objective, authority hierarchy, and stop conditions |
|
|
| Product Contract | `## Product Contract` | `product-contract` | Requirements, actors, flows, acceptance examples, product scope |
|
|
| Product Requirements | `### Requirements` under Product Contract | `product-requirements` | Requirement extraction for review and implementation trace |
|
|
| Planning Contract | `## Planning Contract` | `planning-contract` | KTDs, technical design, assumptions, sequencing |
|
|
| Implementation Units | `## Implementation Units` | `implementation-units` | U-ID work packets for execution |
|
|
| Verification Contract | `## Verification Contract` | `verification-contract` | Repo-specific test commands and quality gates |
|
|
| Definition of Done | `## Definition of Done` | `definition-of-done` | Global and per-unit completion criteria |
|
|
| Appendix | `## Appendix` | `appendix` | Long research, raw notes, or supporting detail |
|
|
|
|
Requirements-only artifacts are kept light: a Goal Capsule and the Product
|
|
Contract. They must not point implementers at absent Planning Contract,
|
|
Implementation Units, Verification Contract, or Definition of Done sections.
|
|
`ce-plan` adds those implementation sections when it enriches to
|
|
implementation-ready. Implementation-ready artifacts include the full registry
|
|
above, except Appendix remains optional.
|
|
|
|
### Wayfinding: map before reading (size-aware)
|
|
|
|
The document does not carry a reading guide; consuming skills own the reading
|
|
algorithm. A **short** plan — a lightweight or requirements-only artifact that
|
|
fits in a screen or two — can just be read in full; that is cheaper and simpler
|
|
than scanning and ranging. But an implementation-ready unified plan is often
|
|
long, and HTML output (also supported) is more verbose still, so for anything
|
|
beyond short, do **not** load the entire artifact to find your way around.
|
|
Build a section map first, then read only the ranges the task needs:
|
|
|
|
- **Markdown:** scan headings to get the section and unit map — e.g.
|
|
`rg -n '^#{1,3} ' <plan>` (top-level sections plus `### U<N>.` units).
|
|
- **HTML:** scan the heading elements (`<h1>`–`<h3>`) and their anchor ids;
|
|
match on the section name and ignore the wrapper tags.
|
|
|
|
In both formats the section **names and anchor ids are the stable contract**
|
|
from the Section ID Registry above (`Goal Capsule`/`goal-capsule`,
|
|
`Verification Contract`/`verification-contract`, `### U<N>.` units, …). Wayfind
|
|
against those registry names, not a brittle tag/format pattern, so the
|
|
instruction survives rendering changes. After mapping, read metadata, then only
|
|
the sections the task needs — e.g. Goal Capsule, the active U-ID plus its cited
|
|
R/F/AE/KTD, Verification Contract, and Definition of Done. Read the Appendix or
|
|
unrelated units only when a section you are already reading cites them.
|
|
|
|
## Decide whether a plan doc is warranted at all
|
|
|
|
Not every invocation of `ce-plan` should produce a plan document. For
|
|
genuinely atomic work, the doc is ceremony — the implementer (whether
|
|
`ce-work` or a human) can act directly without IDed units, KTDs, or
|
|
Requirements as a checklist.
|
|
|
|
**Bias toward producing a plan.** The risk asymmetry favors writing one:
|
|
a thin plan doc for small work is mild ceremony, but skipping a plan when
|
|
one was warranted costs the implementer real time (reinvented decisions,
|
|
lost unit boundaries, no IDed requirements to verify against). When unsure,
|
|
write the plan.
|
|
|
|
**Skip implementation-ready plan creation only when ALL of these hold:**
|
|
|
|
- The work is **atomic** — fits in one commit, no meaningful unit boundaries
|
|
to break out independently.
|
|
- There are **no design choices that constrain implementation** — no
|
|
Key Technical Decisions worth recording. If the work needs the implementer
|
|
to make a choice between two approaches, those approaches are KTDs and
|
|
a plan is warranted.
|
|
- There are **no scope boundaries worth pinning** in writing — the work
|
|
scope is self-evident from the user's request.
|
|
- **No upstream artifact** (a brainstorm with R-IDs, an incident report,
|
|
a deferred-follow-up item from a prior plan) needs traceability through
|
|
this plan.
|
|
|
|
**Stress test the "looks atomic" case.** Many requests look atomic at first
|
|
glance but hide design decisions:
|
|
|
|
- *"Add caching to this endpoint"* — sounds atomic, but TTL, invalidation,
|
|
cache key shape, and backend selection are all KTDs. Write the plan.
|
|
- *"Migrate from package A to package B"* — sounds mechanical, but
|
|
semantic differences between the packages create migration KTDs. Write
|
|
the plan.
|
|
- *"Add rate limiting"* — sounds small, but algorithm, scope, and
|
|
configurability are all KTDs. Write the plan.
|
|
|
|
vs. genuine skip cases:
|
|
|
|
- *"Fix typo in README line 47"* — atomic, no KTDs, skip the plan.
|
|
- *"Rename `oldFn` to `newFn` across the repo"* — mechanical, no design
|
|
choices, skip the plan.
|
|
- *"Bump dependency X to v2.3.1"* — mechanical, skip the plan (unless the
|
|
bump introduces breaking changes that warrant unit-by-unit migration).
|
|
|
|
When skipping the plan doc, the work proceeds directly to `ce-work` or to
|
|
implementation, and any decisions made along the way land in the commit
|
|
message or `docs/solutions/` if they're worth carrying forward.
|
|
|
|
## Implementation-ready hard floor
|
|
|
|
When an implementation-ready software plan is warranted, these sections are
|
|
present. They carry the contracts downstream consumers depend on.
|
|
|
|
- **Goal Capsule** — objective, authority hierarchy, stop conditions, execution
|
|
profile, and tail ownership. This is the fastest way for an executor to
|
|
avoid drifting from the plan.
|
|
- **Product Contract** — product scope and behavior. Contains Summary, Problem
|
|
Frame, Requirements with stable R-IDs, and any material Actors, Flows,
|
|
Acceptance Examples, Success Criteria, Scope Boundaries, Dependencies,
|
|
Outstanding Questions, and Sources. This replaces the separate requirements
|
|
artifact in new brainstorm-to-plan flows.
|
|
- **Planning Contract** — the implementation-facing decisions: Key Technical
|
|
Decisions, high-level design, assumptions, implementation constraints,
|
|
sequencing, and research that shapes how the Product Contract will be built.
|
|
- **Implementation Units** (with stable U-IDs) — discrete work packets sized so
|
|
each is independently executable. Each unit names Goal, Requirements,
|
|
Files, Approach, Test Scenarios, and Verification. `ce-work` and goal-mode
|
|
executors consume these units.
|
|
- **Unit Index (large plans only, ~10+ units).** When the plan has roughly
|
|
ten or more units, open the section with a compact navigation table — one
|
|
row per unit: **U-ID · one-line title · files touched · depends-on**. It
|
|
lets an executor map units to files and resolve dependency order without
|
|
scanning every unit body. It is a **navigation aid only**: the unit bodies
|
|
stay authoritative, it carries nothing beyond those four fields (no
|
|
approach, tests, or rationale), and `files touched` is the key/primary
|
|
paths, not an exhaustive restatement. **Omit it below ~10 units** — there
|
|
the per-unit `Dependencies`/`Files` (and any sequencing or dependency
|
|
diagram) already suffice, and an index would be ceremony.
|
|
- **Verification Contract** — repo-specific commands and quality gates,
|
|
including which tests prove the plan, when `release:validate` applies, and
|
|
what behavioral skill evaluation is required. Avoid generic "run tests"
|
|
language when the repo has concrete commands. When the goal is
|
|
optimization-shaped (build time, latency, coverage, bundle size), express a
|
|
measurable threshold as the exit criterion (e.g., "p95 latency < 200ms",
|
|
"build time reduced 30%") and consider routing to `ce-optimize` — a metric
|
|
target is a sharper done signal for a long-running goal than a boolean check.
|
|
- **Definition of Done** — global and per-unit done criteria. This is the
|
|
completion contract for `/goal` or equivalent long-running workflows. Include
|
|
a cleanup criterion: a long autonomous run accumulates dead-end and
|
|
experimental code from approaches that did not pan out; declaring done
|
|
requires that abandoned-attempt code is removed, not left in the diff.
|
|
|
|
## Include when material
|
|
|
|
These sections are present when they carry information that isn't covered
|
|
elsewhere. The test is not "is this a substantial plan?" — it is
|
|
*"does this specific plan have content this section would surface?"* Filling
|
|
a section with placeholder prose is worse than omitting it.
|
|
|
|
- **High-Level Technical Design** — include when the technical approach has
|
|
shape that prose alone doesn't carry well: architecture across components,
|
|
sequencing across processes, state machines, branching gates.
|
|
Visualizations (component topology, sequence, swim lane, flowchart,
|
|
data-flow) typically live here. Skip when the approach is a one-paragraph
|
|
pattern application that the prose itself conveys.
|
|
|
|
- **Scope Boundaries** — include when scope is contested, when there are
|
|
tempting non-goals worth naming explicitly, or when "deferred for later"
|
|
needs distinguishing from "outside the product's identity." Skip when scope
|
|
is obvious from Requirements alone.
|
|
|
|
- **Open Questions** — include when there are genuinely unresolved items that
|
|
block planning or implementation. Skip when the plan is complete; an empty
|
|
"Open Questions: none" section signals false uncertainty.
|
|
|
|
- **System-Wide Impact** — include when the change affects cross-cutting
|
|
concerns (data lifecycles, auth boundaries, performance posture, cardinal
|
|
rules, shared infrastructure, agent/tool parity, prompt context, shared
|
|
workspaces). Skip for changes localized to one component where the impact is
|
|
self-evident.
|
|
|
|
- **Risks & Dependencies** — include when there are real risks worth flagging
|
|
(external service changes, version pins under churn, behavioral assumptions
|
|
worth highlighting) or material upstream dependencies. Skip for low-risk
|
|
localized work.
|
|
|
|
- **Acceptance Examples** — include when any requirement has a state-dependent
|
|
or conditional shape ("When X, Y") where the prose alone leaves ambiguity
|
|
about edge cases. Skip when all requirements are unconditional and
|
|
unambiguous.
|
|
|
|
- **Documentation / Operational Notes** — include when documentation,
|
|
monitoring, runbooks, or rollout steps need explicit notes. Skip when the
|
|
work is purely internal and uses existing operational scaffolding without
|
|
modification.
|
|
|
|
- **Sources / Research** — surface the research that orients the implementer
|
|
or justifies load-bearing choices. The test: *"if I were the implementer
|
|
reading this cold, would this breadcrumb help me make better choices?"*
|
|
Yes → surface (code locations like `services/convex/reports.ts:174-176`,
|
|
external docs, RFCs, constraints, prior plans — the category is inclusive,
|
|
not enumerated). Process exhaust (reading the user's prompt, glancing at
|
|
obvious entry points, restating prose) → omit. Surface inline next to the
|
|
KTD or unit it justifies, or as a dedicated section — both shapes work.
|
|
|
|
## Agent agency
|
|
|
|
The catalog is a floor, not a ceiling. When the plan's content doesn't fit
|
|
any catalog section, introduce a new one — don't force the content into a
|
|
section it doesn't belong in. Content drives section choices, not vice
|
|
versa.
|
|
|
|
The agent also picks per artifact:
|
|
|
|
- Whether Problem Frame merges into Summary
|
|
- Sub-groupings (Requirements by capability, KTDs by component, Units phased
|
|
into milestones)
|
|
- How much detail each section carries
|
|
- Whether HTD has one diagram, several, or none — and whether visualizations
|
|
live in HTD or embedded in other sections
|
|
|
|
## Prose economy
|
|
|
|
"Include when material" sizes *which* sections appear; this sizes *how the kept
|
|
prose reads*. A section can be material and still be written loosely — the
|
|
failure mode is a material section padded into a wall of text where
|
|
contradictions hide and the implementing agent loses the thread. A deep plan
|
|
earns length through coverage (more units, more traced requirements, real
|
|
risks), never through wordiness around that coverage.
|
|
|
|
Hold every kept section to these:
|
|
|
|
- **Lead with the decision or outcome.** Put the conclusion first, then the
|
|
reason, then background; keep one claim plus its support per paragraph. Don't
|
|
bury a Key Technical Decision, the chosen scope, an open blocker, or a unit
|
|
goal beneath its rationale. This does not override section roles — Summary
|
|
stays proposal-only, Problem Frame stays motivation-only and never restates
|
|
the remedy.
|
|
- **One idea per sentence.** A Summary is a handful of sentences, not one
|
|
sentence with five semicolons and four parentheticals. A KTD's rationale is
|
|
the load-bearing reason, not every reason.
|
|
- **A requirement or unit is one sentence of intent plus at most one
|
|
qualifier.** When it would specify two outcomes ("either A or B, the
|
|
implementer decides"), state the intent and send the fork to Open Questions —
|
|
don't write both arms in full inside the item.
|
|
- **Cut hedges and intensifiers.** "Critically", "deliberately", "explicitly",
|
|
"genuinely", "actually", "simply" carry nothing the implementer acts on.
|
|
- **Prefer the verb to the nominalization.** "Demote the grid", not "the
|
|
demotion of the grid is the deliberate change in this plan".
|
|
|
|
Precision is not padding: keep file paths, IDs, dates, domain terms,
|
|
conditionals, and exact thresholds verbatim; when a concrete anchor is knowable
|
|
from the work already done, use it instead of a vague abstraction. Economy
|
|
targets the connective tissue around precision, never the precision itself.
|
|
|
|
**Resolve in place; don't stratify.** When deepening, a doc-review pass, or a
|
|
later decision supersedes earlier text, rewrite or remove the original — don't
|
|
leave it standing as strikethrough or stack a separate "resolutions" layer on
|
|
top of it. Version control holds the history. Stacked strata double the reading
|
|
surface and hide which text is live.
|
|
|
|
**Named test, run before the plan is declared written:** could the implementer
|
|
find a contradiction in each section in one pass? A sentence carrying more than
|
|
one parenthetical, or an item specifying two outcomes, fails the test — split it
|
|
or defer it.
|
|
|
|
## Plan metadata fields
|
|
|
|
Every plan carries a small set of stable metadata fields that downstream
|
|
tooling depends on. The contract is format-independent: in markdown these
|
|
fields appear as YAML frontmatter at the top of the file; in HTML they
|
|
appear as visible header text (typically a `<dl>` of `<dt>`/`<dd>` pairs or
|
|
a stats strip). Field names and semantics are the same across both formats
|
|
so consumers can locate them without knowing which format produced the
|
|
plan.
|
|
|
|
### Required
|
|
|
|
- **`title`** — the plan's descriptive name with a ` - Plan` suffix
|
|
(e.g., `Highlighter Tool - Plan`), matching the H1 (markdown) or document
|
|
`<h1>` (HTML) so file metadata and visible heading don't drift. Stable
|
|
across readiness states (it is a plan at every stage). Do not put a
|
|
conventional-commit prefix (`feat:`/`fix:`) in the title — the `type` field
|
|
carries that classification.
|
|
- **`type`** — conventional-commit-prefix-aligned classification (`feat`,
|
|
`fix`, `refactor`, `chore`, `docs`, `perf`, `test`, etc.). Carries the
|
|
intent the eventual commit message should reflect.
|
|
- **`date`** — creation date in ISO 8601 (`YYYY-MM-DD`), ASCII digits only.
|
|
|
|
Plans carry **no `status` field** — a plan is a decision artifact, not a
|
|
tracked work item. `ce-work` does not mutate the plan at ship time;
|
|
whether a plan shipped is derived from git, not stored in the doc. Do not
|
|
add a `status` field or an `active → completed` lifecycle.
|
|
|
|
### Optional but well-known
|
|
|
|
These fields are not required, but when set they have fixed names and
|
|
semantics so downstream tooling can rely on them:
|
|
|
|
- **`origin`** — repo-relative path to an upstream brainstorm requirements
|
|
doc (e.g., `docs/brainstorms/2026-05-12-pagination-requirements.md`).
|
|
Set when planning from an upstream brainstorm; carried for traceability
|
|
and re-resolved when `ce-plan` re-deepens.
|
|
- **`deepened`** — ISO 8601 date marking the first time the confidence
|
|
check substantively strengthened the plan. Presence affects Phase 0.1
|
|
resume fast-path logic (see `references/deepening-workflow.md`).
|
|
- **`execution`** — execution domain for downstream routing: `code`
|
|
(the default when absent) or `knowledge-work`. `ce-work`'s input triage
|
|
reads this: a plan marked `execution: knowledge-work` routes to the
|
|
non-code carve-out (read sources, synthesize, produce a deliverable —
|
|
skipping the branch/test/commit/CI lifecycle); absent or `code` routes
|
|
to the normal code path. Written by `ce-plan`'s approach-altitude flow
|
|
(`references/approach-altitude.md`) when a non-code deliverable is
|
|
persisted for execution.
|
|
|
|
Field names are stable across plan revisions — never rename a field or
|
|
repurpose its semantics. Agents composing new plans MUST use these exact
|
|
names; adding new fields is fine, but renaming `origin` to `source` or
|
|
`date` to `created` breaks the downstream consumers above.
|
|
|
|
## ID and content rules
|
|
|
|
These apply regardless of rendering format.
|
|
|
|
- **Stable IDs.** R-IDs (Requirements), U-IDs (Implementation Units), A-IDs
|
|
(if Actors fire), F-IDs (if Flows fire), AE-IDs (if Acceptance Examples
|
|
fire). IDs are stable across plan revisions — never renumber to "clean
|
|
up gaps."
|
|
- **Plain prefix.** `R1.`, `U1.` as bullet prefixes. Do not bold; the prefix
|
|
is visually distinctive on its own.
|
|
- **Repo-relative paths.** Always. Never absolute paths in plan content;
|
|
they break portability across machines, worktrees, teammates.
|
|
- **No process exhaust.** No "captured at Phase X" notes, no `## Next Steps`
|
|
pointing to the next skill, no italic provenance lines. Engineering process
|
|
metadata belongs in commit messages and tool output, not the artifact.
|
|
- **Group Requirements by concern when they span distinct logical areas.**
|
|
The trigger is distinct concerns, not item count — even four requirements
|
|
benefit from grouping if they cover three different topics. Skip grouping
|
|
only when all requirements are genuinely about the same thing; a long flat
|
|
list is a smell that subgroups were missed. Group by capability (e.g.,
|
|
"Packaging", "Migration and compatibility", "Contributor workflow"), not by
|
|
the order requirements were discussed. R-IDs stay continuous across groups
|
|
(R1, R2 in the first group; R3, R4 in the second; never restart at R1 per
|
|
group).
|
|
|
|
## Rendering
|
|
|
|
The format-specific references describe how to render these sections in each
|
|
output format:
|
|
|
|
- **Markdown rendering:** `references/markdown-rendering.md`
|
|
- **HTML rendering:** `references/html-rendering.md`
|
|
|
|
This reference (`plan-sections.md`) is about WHAT the plan contains;
|
|
rendering references are about HOW each format presents it. The plan is
|
|
written in one format — markdown OR HTML, never both — based on the
|
|
resolved output mode. The section catalog is the same regardless of
|
|
format.
|