项目文件夹

文件
wehub-resource-sync 36b3af2e3d
PR Check / Code Quality: Format (push) Failing after 1s
PR Check / Code Quality: Lint (darwin) (push) Failing after 0s
PR Check / Code Quality: Lint (freebsd) (push) Failing after 1s
PR Check / Code Quality: Lint (windows) (push) Failing after 1s
PR Check / Code Quality: Lint (linux) (push) Failing after 1s
PR Check / Security: Vulnerability Scan (push) Failing after 0s
Update Documentation / update-docs (push) Failing after 2s
PR Check / Code Quality: Vendor (push) Failing after 1s
PR Check / Code Quality: Coverage (push) Failing after 0s
PR Check / Tests: Unit (macos-latest) (push) Has been cancelled
PR Check / Tests: Unit (ubuntu-24.04) (push) Has been cancelled
PR Check / Tests: Unit (ubuntu-24.04-arm) (push) Has been cancelled
PR Check / Tests: Unit (windows-latest) (push) Has been cancelled
chore: import upstream snapshot with attribution
2026-07-13 12:22:06 +08:00

986 B

Description

Briefly describe what this PR does. Mention existing issue number, if applicable.

Type of change

Check all that apply:

  • Bug fix (non-breaking change which fixes an issue)
  • New feature (non-breaking change which adds functionality)
  • Breaking change (may affect existing functionality)
  • This change requires a documentation update

Checklist

  • I have formatted my code using go fmt ./...
  • I have opened this PR against the staging branch
  • I have performed a self-review of my own code
  • I have added helpful comments where needed
  • I have made corresponding changes to the documentation
  • My changes generate no new warnings
  • New and existing unit tests pass locally with my changes

Thank you for your contribution! 🎉

We’re excited to review your pull request. Please fill out the details above to help us understand your changes. Don’t worry if you can’t check every box, just do your best!