2.8 KiB
Priorities
The ranked work queue for the autonomous improvement loop. The architecture-review pass (the architect) owns this file: each run it turns the roadmap plus an internal scan (gaps in the services → agents → workflows lifecycle, API coherence, drift, tech debt, test and DX friction) into a single ordered list — highest-value first — and links each item to a tracking issue. The hourly continuous-improvement pass works the top item whose issue is still open. So the architect decides what, and the increment loop builds it.
Reading / editing. An item is done when its linked issue closes (the increment
that builds it adds Closes #<issue>). Roadmap phase (Now → Next → Later) is the
primary ordering; internal findings are interleaved by value, not kept in a
separate list. The human can reorder this list — or the issues — at any time to
redirect the loop; direction always wins.
Off-limits to the loop (the architect proposes these as notes, never as queue items the loop can auto-merge): brand/positioning copy, breaking public-API changes, architectural rewrites. Those go to the human.
Work queue (ranked)
- Enforce exact-once AtlasCloud plan-delegate notifications (#4189) — #4195 closed the guarded-delegate conformance gap from #4183, so the remaining live-provider Now-phase failure is the exact-once side-effect seam: AtlasCloud/minimax can complete the plan/delegate path but replay the delegated owner notification. Make the harness and idempotency path reject duplicate delegate/notify effects so services → agents → workflows behavior is reliable under real model retries.
- Verify installed first-agent on-ramp commands (#4197) — developer adoption is the current goal, and the canonical story in the README, website, and recent blog posts depends on a provider-free path that works from the installed CLI. Keep
micro agent demo,micro examples,micro zero-to-hero, first-agent docs, debugging, and 0→hero wayfinding aligned and CI-verifiable so 0→1 does not regress while hardening continues. - Propagate cancellation and retry signals through provider model calls (#4175) — after the exact-once live conformance gap and the installed on-ramp contract, the next Now-phase reliability gap is failure handling under real provider conditions: cancellation/deadline propagation and retry/backoff must not duplicate tool side effects. This keeps the same services → agents → workflows lifecycle dependable across providers without changing public APIs.
Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the architecture-review pass.