项目文件夹

文件
Codex 229bd5bf8a
Run Tests / Unit Tests (push) Has been cancelled
Harness (E2E) / Harnesses (mock LLM) (push) Has been cancelled
Harness (E2E) / Provider harnesses (live LLM conformance) (push) Has been cancelled
Lint / golangci-lint (push) Has been cancelled
Run Tests / Etcd Integration Tests (push) Has been cancelled
docs: refresh planner priorities for 4147
2026-07-06 13:28:27 +00:00

2.2 KiB

Priorities

The ranked work queue for the autonomous improvement loop. The architecture-review pass (the architect) owns this file: each run it turns the roadmap plus an internal scan (gaps in the services → agents → workflows lifecycle, API coherence, drift, tech debt, test and DX friction) into a single ordered list — highest-value first — and links each item to a tracking issue. The hourly continuous-improvement pass works the top item whose issue is still open. So the architect decides what, and the increment loop builds it.

Reading / editing. An item is done when its linked issue closes (the increment that builds it adds Closes #<issue>). Roadmap phase (Now → Next → Later) is the primary ordering; internal findings are interleaved by value, not kept in a separate list. The human can reorder this list — or the issues — at any time to redirect the loop; direction always wins.

Off-limits to the loop (the architect proposes these as notes, never as queue items the loop can auto-merge): brand/positioning copy, breaking public-API changes, architectural rewrites. Those go to the human.

Work queue (ranked)

  1. Verify no-secret agent debugging walkthrough (#4142) — with the plan-delegate completion regression fixed in #4146, the highest-value remaining Now-phase gap is the developer adoption path immediately after the first chat. Extend the maintained provider-free 0→1 route into micro inspect agent, run history, memory, and provider checks so renamed commands or stale debugging docs fail in CI where new developers most need confidence.
  2. Add durable agent checkpoint resume smoke coverage (#4148) — once the first-agent debugging seam is protected, move to the top Next-phase harness gap: prove an interrupted agent run can resume from persisted state with enough run/step history for inspect/debugging. This keeps the services → agents → workflows lifecycle cohesive by giving agents the same durability story flows already have, without taking on a breaking API redesign.

Seeded by Claude Code from the roadmap + open issues; thereafter maintained by the architecture-review pass.